Primary tabs

Alternatives 2

Welding or gluing on site

Conveyor belts may be welded or glued on site by using a hot press in accordance with the splicing and welding procedure. For that, you need to buy a hot press or pay a maintenance intervention.

This type of intervention takes at least 3 hours.

The conveyor belts with mechanical fastening system ERO joint® are assembled in 15 minutes. Thanks to this new lacing technology, production costs are significantly reduce and the downtime too.

On site welding